Process

Curate your collection

Send to our team

We’ll get in touch shortly

You’re in the online store

Your selection will be cleared if you change to a different country/region.

The Purposeful Workplace
Brand Affiliates
Certification Partners
Revit Library
ColourLab Palette
Sustainability
Authentically Australian
I'm looking for
Did you mean ?
a space for my team
or Search by
Projects

Whybin TBWA

Corporate
furniture, table, cafeteria, indoors, restaurant, interior design, plywood, wood, person, desk

Overview

A brand-new team fitout in five weeks

Having recently gained a large new account, Whybin TBWA required the existing space in half of their office to be renovated within a five-week period. The space was to fit the company’s 30 new staff and be light, fresh, functional and inspiring.

In response to the client brief, designer Bates Smart decided that to encourage staff interaction and team based collaboration, the existing heavily partitioned, insular spaces would have to be broken down.

Schiavello was engaged to undertake the interior construction and supply the workstations and storage due to the company’s ability to deliver a quality result within a tight timeframe

Full Width Image

Collaboration

Furniture for a collaborative studio environment

Schiavello’s One Plane Desk system was selected by for its simplicity and flexibility, as well as its complementary storage components, which allowed customisation to accommodate the practical needs of the client. The combination of the clean lines of the One Plane Desk and the raised nature of the Kase Storage provided a lightness and openness that fostered the collaborative studio workspace that the client required.

Left Image
Right Image

Interior construction team

Unravelling an electricalbird’s nest

The building had hosted a number of fitouts in the past, which created a challenge from an electrical perspective for Schiavello’s interior construction team. The design brief called for all the services in the ceiling to be exposed – mechanical, electrical, plumbing and fire – however when the ceiling tiles were removed, the ceiling space was a ‘bird’s nest’ of cables.

Schiavello Construction worked closely with subcontractors and Whybin TBWA’s IT personnel to rewire and redesign wiring routs on the ground floor and much of the first floor. This was done while the communications room, located on the ground floor, remained operational.

The result is a light and fresh open plan workspace that inspires teamwork and interaction while providing a number of formal and informal meeting areas and breakout spaces for varying work requirements.

Photography by Shannon McGrath