Process

Curate your collection

Send to our team

We’ll get in touch shortly

You’re in the online store

Your selection will be cleared if you change to a different country/region.

The Purposeful Workplace
Brand Affiliates
Certification Partners
Revit Library
ColourLab Palette
Sustainability
Authentically Australian
I'm looking for
Did you mean ?
a space for my team
or Search by
Projects

Origin Energy Power Station

Technology
furniture, table, desk, screen, computer hardware, hardware, monitor, person, chair, computer

Overview

Origin Energy power station powers up with ergonomics

Control room environments are the latest space to get on-board with the sit/stand revolution. Employees at Origin Energy’s Eraring Power Station can work while standing – all thanks to intuitive Schiavello furniture.

The Eraring Power Station is Australia’s largest power station, located 30 minutes south of Newcastle. Recent upgrades to the facility’s control room saw Origin make the pioneering decision to make the traditionally static space sit/stand in a bid to improve ergonomics and drive better efficiencies.

Full Width Image

144sqm power epicentre

Advanced engineered furniture solutions

Control centre specialist Russell Ockendon designed the 144sqm power epicentre, complete with improved sound, lighting and complex audio-visual technology.

Schiavello then worked with Ockendon and Origin to devise advanced engineered furniture solutions. This allowed seamless synchronisation of screens, on-desk monitors and worktops in both sit and stand modes.

The project entailed four main components, the first being the customisation of Krossi work points featuring a sophisticated solid timber edge detail and customised on-desk dual monitor arms. The second component involved Schiavello’s product design team developing 24 height adjustable monitor arm assemblies capable of holding two 46-inch monitors (weighing approximately 60kg), which ordinarily would be wall mounted due to their weight.

These assemblies were then attached to speciality actuators sourced from Germany, which allowed them to move in synchronisation with the desks. Lastly, fabricated component compartments were tailored to meet the magnitude of Origin’s power and data requirements.

Full Width Image

Sophisticated synchronisation

Client and designer consultation

Luke Irving, Schiavello Product Solutions Consultant, says the project was an engineering feat for the team. “It’s great to see that people working in control room environments are increasingly benefiting from ergonomic improvements in this space. For us at Schiavello, a lot of development went into ensuring such sophisticated synchronisation on such a large scale, and we are extremely proud of the end result.”

Prototyping at Schiavello’s Tullamarine manufacturing facility, along with constant client and designer consultation, ensured all design details were successfully finalised in the short lead-time of just two months. The project was then successfully rolled out in stages whilst Origin remained operational.

Full Width Image